C1 · METHOD
Cost per accepted job
= ( inference + tools and sandbox
+ retries and failed attempts
+ verification + operating overhead )
÷ accepted jobs
with the latency requirement stated
Inference tokensmeasured + modelled
Tools and sandboxcore-seconds
Retries and failed attemptscounted
Verificationpass / fail
Operating overheadnot measured — excluded
C11 · C12 · MODEL · ONE ACCEPTED JOB
One accepted job · 3,704 out + 74,088 in tokens
Frontier list
Owned · marginal
Owned · all-in
Inference$0.0326$0.0004$0.0024
Tools and sandbox$0.0024$0.0024$0.0024
Retries and failed attempts$0.0008$0.0008$0.0008
Verificationincludedincludedincluded
Total per accepted job
$0.0359
$0.0036
$0.0057
≈9.9× vs marginal · ≈6.3× vs all-in
identical tool, retry and verification terms in all three columns